Works Achievements
Works and Technical Services
Water & Sanitation
- Drilling, casting and installation of 18 boreholes out of 18 planned under WaterAid support project.
- Drilling, casting and installation of 3 boreholes out of 3 planned under DWSCG-PAF.
- Construction of 9 Hand dug wells out of 19 planned under DWSCG-PAF/PRDP.
- Protection of 5 medium springs out of 5 planned under DWSCG-PAF/PRDP.
- Airing of water and sanitation related radio spot programmes
- Formation and training of 18 WSCs under WaterAid support project.
- Formation and training of 16 WSCs.
- Home improvement campaigns in 4 RGCs.
- Rehabilitated 5 Boreholes out of the 5 planned under LGMSD.
- Rehabilitated 5 Boreholes out of the 5 planned under WaterAid support project.
- Procurement of 4 TVS Motocycles for H/As under Water Aid
- Procurement of a Laptope Computer for Project Accountant under Water Aid.
- Construction of 7 five stance Lined V.I.P latrines out of 18 planned under WaterAid support project.
- Commemorating Sanitation week 14ht – 24th March 2011 funded by WaterAid support project
Roads
- Periodic maintenance of Mutunda – Diima road(13.2km) under PAF
- Periodic maintenance of Diika – Katulikire (14km) under PAF
- Periodic maintenance of Kisorosoro – Diika (10.2)km under LGMSD
- Periodic maintenance of Kisindizi – Kinumi (7.1km) under PAF
- Periodic maintenance of Kinumi – Katagurukwa (9.2km) under PAF
- Rehabilitation of Kiryandongo – Kitwara(24km) under PRDP
- Rehabilitation of Ibaralibi – Alimugonza (24km) under PRDP
- Rehabilitation of Kizibu – Kaduku (5.8 km) under PRDP
- Rehabilitation of Butoobe – Kakwese (4.7km) under LGMSD
- Opening and upgrading of Laboke – Kololo CAR (11km) into a District road under DLSP
- Opening and upgrading of Kihaguzi – Kyakamese CAR (10.45km) into a District road under DLSP
- Opening and upgrading of Ntooma – Rwebigwara CAR (07km) into a District road under DLSP
- Opening and upgrading of Bisaju – Towasati CAR (11.7km) into a District road under DLSP
- Repair of bottle necks and spot improvements on Kijura – Kabalye( Kiryanga – Kyema road)
- Repair of bottle necks and spot improvements on Kijunjubwa – Kitamba road
- Routine maintenance on the entire District road network of 624.95km in Fy 2009/10
- Periodic maintenance of Kitamba – Kijunjubwa (0-10)km under LGSIP;
- Periodic maintenance of Kitamba – Kijunjubwa (10-20)km under URF;
- Periodic maintenance of Kiina – Kitonozi (4.8km) under URF;
- Rehabilitation of Butoobe – Kiina (6.25km) under PRDP;
- Rehabilitation of Isimba – Kitooka (10.2km) under PRDP;
- Rehabilitation of kihonda – Walyoba (7.4km) under PRDP;
- Routine maintenance of 316.7km of District road network in FY 2010/11
- Keeping 64.5% of district Road network in atleast a fair motorable state by carrying out Routine Maintenance of 316.7km of District road under URF
- Formation and training of Road Committees in pakanyi S/c, Mirrya S/c, Kimengo S/c, and Budongo S/c
- Carrying out Road Inventory and Condition Surveys on roads that are being rehabilitated under PRDP, URF, LOGSIP, DLSP, and Luweero Triangle funding.
- Planned Rehabilitation and Periodic Maintenance works for FY 2010/2011 are now at 70.3% completion.
Engineering
- Maintained Vehicles in the District thus supporting implementation of PEAP related programs.
- The subsector provided supervisory support to Lower local Governments and other departments in construction of 23Classrooms at Kihande (02), Karujubu(02), Mihembero(02), Ntooma(02), Wakisanyi(02), Nyamigisa(08) and Kikingura(05) under SFG and LGDP; A staff House at Kibyama Health centre, health unit at Kirokoin Kiryandongo Sub-County and completion of OPD at Kiigya Health Centre II